2.9 KiB
2.9 KiB
CPD User Guide
Changing the sample
- Stop the turbopump:
- Press the stop button on the control panel
- Close the valve between pump and chamber (on top of the turbo pump), by screwing it into the pump
- Ventilate the chamber
- Open the gate valve
- Carefully open the needle valve (usually less than 1/8 turn)
- When the chamber can be moved, close both valves again
- Take off the chamber
- Make some space to put the chamber (mind the grease on the bottom edge)
- Carefully lift the chamber. Good places to grab it are the tubing on the left and the right bottom edge.
Caution: The tube connecting the chamber with the pump will exert a force to the right!
Make sure you do not crash the chamber into the sample tray!
- Move the sample away from the gold mesh
- Move the tray fully down by turning the upper micrometer screw counterclockwise
- Move the tray fully to the left using the larger micrometer screw
- Loosen the screw on the clamp holding the sample in place and remove the sample
- Prepare the new sample
- Put the sample on the tray and place the clamp on it.
- Tighten the clamp screw (you might need to grab the nut on the bottom side)
- Move the tray in x-position using the large micrometer screw.
The gold mesh should be well aligned with the sample surface - Carefully move the tray up by turning the small micrometer screw clockwise.
Leave about half a millimeter of space between the sample and the gold mesh
Do not crash the sample into the gold mesh!
- Put the chamber back on
- Put the chamber back on and align it on the two posts on the bottom and right
- Check the backside to make sure that no cables are sticking out
- Vacuum the chamber
-
Make sure the nitrogen venting valves are closed
-
Make sure the turbopump is not spinning anymore
-
When the turbopump has fully stopped, very slowly open the valve on top of the pump
-
Fully open the valve TODO: hier noch irgendwelche checks?
-
Wait until the vacuum is in the lower
10^{-2}
range (read the value from the sensor attached to the turbopump) -
Only when this target pressure is reached, turn on the turbopump (control panel on top)
-
Wait until the desired vacuum for measurement is reached (usually
10^{-5}
)10^{-4}
: TODO10^{-5}
: TODO10^{-6}
: after 1-2 days
If the pressure does not drop enough: Use isopropanol to inspect for leaks
-
CPD Controller Calibration
TODO
This process is not always necessary.
- Set CPD Controller to Manual, Offset=Gold Work Function, Filter off (so you can see what happens immediately), Oscillator to ~2
- Move the micrometer screw close until a signal appears
- Set Automatic offset so that the output is 0V Calibration: Fresh graphite probe
cpdctrl-gui Software
TODO