Add user guide
This commit is contained in:
parent
f1b93805ff
commit
186a2d46b4
6
cpdctrl_gui/resources/troubleshooting.md
Normal file
6
cpdctrl_gui/resources/troubleshooting.md
Normal file
@ -0,0 +1,6 @@
|
||||
## Troubleshooting
|
||||
### 1) The LED does not work
|
||||
1) Make sure the Thorlabs LED is plugged in, turned on (turn the dial to a non-zero value) and that the switch is in the **TRIG**er position
|
||||
2) Reset the Arduino by pressing the white button on the top and restart the program
|
||||
3) Unplug and replug the Arduino and restart the program
|
||||
4) Re-upload the code (see section "Arduino Code")
|
54
cpdctrl_gui/resources/user_guide.md
Normal file
54
cpdctrl_gui/resources/user_guide.md
Normal file
@ -0,0 +1,54 @@
|
||||
# CPD User Guide
|
||||
## Changing the sample
|
||||
1. Stop the turbopump:
|
||||
1. Press the stop button on the control panel
|
||||
2. Close the valve between pump and chamber (on top of the turbo pump), by screwing it into the pump
|
||||
2. Ventilate the chamber
|
||||
1. Open the gate valve
|
||||
2. Carefully open the needle valve (usually less than 1/8 turn)
|
||||
3. When the chamber can be moved, close both valves again
|
||||
3. Take off the chamber
|
||||
1. Make some space to put the chamber (mind the grease on the bottom edge)
|
||||
2. Carefully lift the chamber. Good places to grab it are the tubing on the left and the right bottom edge.
|
||||
***Caution***: The tube connecting the chamber with the pump will exert a force to the right!
|
||||
**Make sure you do not crash the chamber into the sample tray!**
|
||||
4. Move the sample away from the gold mesh
|
||||
1. Move the tray fully down by turning the upper micrometer screw *counterclockwise*
|
||||
2. Move the tray fully to the left using the larger micrometer screw
|
||||
3. Loosen the screw on the clamp holding the sample in place and remove the sample
|
||||
5. Prepare the new sample
|
||||
1. Put the sample on the tray and place the clamp on it.
|
||||
2. Tighten the clamp screw (you might need to grab the nut on the bottom side)
|
||||
3. Move the tray in x-position using the large micrometer screw.
|
||||
The gold mesh should be well aligned with the sample surface
|
||||
4. Carefully move the tray up by turning the small micrometer screw *clockwise*.
|
||||
Leave about half a millimeter of space between the sample and the gold mesh
|
||||
**Do not crash the sample into the gold mesh!**
|
||||
6. Put the chamber back on
|
||||
1. Put the chamber back on and align it on the two posts on the bottom and right
|
||||
2. Check the backside to make sure that no cables are sticking out
|
||||
7. Vacuum the chamber
|
||||
1. Make sure the nitrogen venting valves are closed
|
||||
2. **Make sure the turbopump is not spinning anymore**
|
||||
3. When the turbopump has fully stopped, very slowly open the valve on top of the pump
|
||||
4. Fully open the valve **TODO: hier noch irgendwelche checks?**
|
||||
5. **Wait** until the vacuum is in the lower $10^{-2}$ range (read the value from the sensor attached to the turbopump)
|
||||
6. Only when this target pressure is reached, turn on the turbopump (control panel on top)
|
||||
7. Wait until the desired vacuum for measurement is reached (usually $10^{-5}$)
|
||||
- $10^{-4}$: **TODO**
|
||||
- $10^{-5}$: **TODO**
|
||||
- $10^{-6}$: after 1-2 days
|
||||
|
||||
If the pressure does not drop enough: Use isopropanol to inspect for leaks
|
||||
|
||||
## CPD Controller Calibration
|
||||
**TODO**
|
||||
|
||||
This process is not always necessary.
|
||||
1. Set CPD Controller to Manual, Offset=Gold Work Function, Filter off (so you can see what happens immediately), Oscillator to ~2
|
||||
2. Move the micrometer screw close until a signal appears
|
||||
3. Set Automatic offset so that the output is 0V
|
||||
Calibration: Fresh graphite probe
|
||||
|
||||
## cpdctrl-gui Software
|
||||
**TODO**
|
Loading…
x
Reference in New Issue
Block a user